IndustrialBoilers.ca   /   Alberta, CanadaProcess heat. Plant performance. Clear decisions.
TOOLS / PRELIMINARY ESTIMATES

Put numbers around the requirement.

Transparent assumptions. Useful conversations. Technical tools for early project planning.

Planning estimates only

Results do not establish equipment suitability, safe operating conditions or regulatory compliance. Have a qualified engineer confirm the design, assumptions and allowances.

01 / WATER HEATING

How much useful heat?

kW = L/min × 4.186 × ΔT ÷ 60

Assumes liquid water at 1 kg/L and constant specific heat of 4.186 kJ/(kg·K). Excludes losses, phase change, fouling, glycol, redundancy and design margins. Not valid for steam generation or pressure/temperature limit determination.

02 / CAPACITY CONVERSION

Translate boiler horsepower.

1 BHP ≈ 9.8095 kW thermal

Boiler horsepower is a conventional thermal rating, distinct from mechanical horsepower. It corresponds approximately to 34.5 lb/h equivalent evaporation from and at 212°F. Actual steam flow depends on pressure, feedwater enthalpy, losses and equipment rating basis.

03 / ENERGY SCENARIO

Compare assumed fuel use.

Fuel GJ = kW × hours × 0.0036 ÷ efficiency

Efficiencies must use the same fuel heating-value basis and represent comparable annual operating conditions. No energy price, savings guarantee, emissions factor or payback is assumed. Lower scenario efficiency produces increased fuel use.

04 / SYSTEM EXPLORER

Follow the heat.

EXPLORE THE SYSTEM
FeedwatertankBoilerProcess loadSteam supply →← Condensate return

Steam supply. Useful heat moves from the boiler to the process. Define pressure, demand and steam quality at the point of use.

Simplified educational schematic. Protective devices, pumps, treatment and other components are omitted. Not an installation or operating drawing.

LET’S DEFINE YOUR NEXT MOVE

Make heat work harder.

Start with your plant, your duty and your timeline. Build a useful brief for your next boiler project.

Start your project